Back to requirement list

Requirement details

Name Hydrographic network
Note The requirement represents information regarding all hydrographic networks. The categories expected includes permanent water bodies (lake, open water) and the coastline, and also the theme of the rivers network and their catchments, i.e. of those auxiliary elements (reservoir) for the interpretation of the hydrographic system. Coverage requirement: Global. Geometry type: point/line/polygon.
Dissemination View and Download Service
Quality Control Procedure N/A
Group Hydrography
Status -
Uncertainty
N/A
N/A
N/A
Update Frequency
3 years
1 year
6 months
Timeliness
3 hours
1 hour
< 1 hour
Scale
>1:50000
1:25000
>1:10000
Horizontal resolution
25 m
12.5 m
5 m
Vertical resolution
N/A
N/A
N/A
Essential variables
State Ready
Created on Nov. 17, 2017, 9:33 a.m.
Last updated on Sept. 26, 2024, 10:03 a.m.

Products

Product Level of definition Relevant for Criticality Barriers Note Created on Last updated on
Emergency Grading map Firm Product generation Essential Availability, Timeliness Nov. 17, 2017, 9:39 a.m. Sept. 26, 2024, 10:02 a.m.
P01 - Digital Surface Model (DSM) | P01.1 - DSM (based on optical VHR data) Firm Product generation Essential Availability May 12, 2020, 12:07 p.m. Sept. 26, 2024, 10:02 a.m.
Emergency Reference Map Firm Product generation Essential Availability, Timeliness Nov. 17, 2017, 9:39 a.m. Sept. 26, 2024, 10:02 a.m.
Preparedness - Pre-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 11:42 a.m. Sept. 26, 2024, 10:02 a.m.
P02 - Reference dataset | P02.3b - Reference dataset @1:25000 high level update Firm Product generation Essential Availability May 12, 2020, 12:31 p.m. Sept. 26, 2024, 10:02 a.m.
P02 - Reference dataset | P02.2b - Reference dataset @1:10000 high level update Firm Product generation Essential Availability May 12, 2020, 12:30 p.m. Sept. 26, 2024, 10:02 a.m.
P02 - Reference dataset | P02.3a - Reference dataset @1:25000 low level update Firm Product generation Essential Availability May 12, 2020, 12:30 p.m. Sept. 26, 2024, 10:02 a.m.
P01 - Digital Surface Model (DSM) | P01.2 - DSM (based on radar VHR data) Firm Product generation Essential Availability May 12, 2020, 12:11 p.m. Sept. 26, 2024, 10:02 a.m.
P02 - Reference dataset | P02.2a - Reference dataset @1:10000 low level update Firm Product generation Essential Availability May 12, 2020, 12:22 p.m. Sept. 26, 2024, 10:02 a.m.
P03 - Land Use and Land Cover datasets | P03.3 - LULC: CLC @1:250000 (UPDATE) Firm Product generation Essential Availability May 13, 2020, 11:48 a.m. Sept. 26, 2024, 10:02 a.m.
P03 - Land Use and Land Cover datasets | P03.4 - LULC: Urban Atlas @1:10000 (NEW) Firm Product generation Essential Availability May 13, 2020, 11:48 a.m. Sept. 26, 2024, 10:03 a.m.
P08 - Detailed damage assessment analysis over affected areas | P08.2 - Detailed damage assessment analyses over affected areas @ 1:10.000 Firm Product generation Essential Availability May 13, 2020, 11:51 a.m. Sept. 26, 2024, 10:03 a.m.
P04 - Flood delineation Firm Product generation Essential Availability May 13, 2020, 11:50 a.m. Sept. 26, 2024, 10:03 a.m.
P03 - Land Use and Land Cover datasets | P03.6 - LULC: CLC @1:250000 (NEW) Firm Product generation Essential Availability May 13, 2020, 11:49 a.m. Sept. 26, 2024, 10:03 a.m.
P03 - Land Use and Land Cover datasets | P03.5 - LULC: CLC @1:25000 (NEW) Firm Product generation Essential Availability May 13, 2020, 11:49 a.m. Sept. 26, 2024, 10:03 a.m.
P14 - Impact assessment/exposure analysis on assets and population Firm Product generation Essential Availability May 13, 2020, 11:53 a.m. Sept. 26, 2024, 10:03 a.m.
P17 - Post-disaster landslide risk assessment Firm Product generation Essential Availability May 13, 2020, 11:53 a.m. Sept. 26, 2024, 10:03 a.m.
P05 - Modelled flood extent for major events Firm Product generation Essential Availability May 13, 2020, 11:50 a.m. Sept. 26, 2024, 10:03 a.m.
P06 - Temporal analyses of occurred flood events Firm Product generation Essential Availability May 13, 2020, 11:50 a.m. Sept. 26, 2024, 10:03 a.m.
P16 - Post-disaster soil erosion risk assessment Firm Product generation Essential Availability May 13, 2020, 11:53 a.m. Sept. 26, 2024, 10:03 a.m.
P15 - Detailed impact assessment/exposure analyses on selected aspect Firm Product generation Essential Availability May 13, 2020, 11:53 a.m. Sept. 26, 2024, 10:03 a.m.
P09 - Reconstruction monitoring Firm Product generation Essential Availability May 13, 2020, 11:51 a.m. Sept. 26, 2024, 10:03 a.m.
Emergency Delineation Map Firm Product generation Essential Availability, Timeliness Nov. 17, 2017, 9:39 a.m. Sept. 26, 2024, 10:03 a.m.
Prevention - Reference Maps Firm Product generation Essential Availability Jan. 20, 2021, 11:39 a.m. Sept. 26, 2024, 10:03 a.m.
First Estimate Product Firm Product generation Essential Availability, Timeliness June 28, 2019, 12:12 p.m. Sept. 26, 2024, 10:03 a.m.
P03 - Land Use and Land Cover datasets | P03.1 - LULC: Urban Atlas @1:10000 (UPDATE) Firm Product generation Essential Availability May 13, 2020, 11:46 a.m. Sept. 26, 2024, 10:03 a.m.
P01 - Digital Surface Model (DSM) | P01.3 - DSM (based on both optical and radar VHR data) Firm Product generation Essential Availability May 12, 2020, 12:11 p.m. Sept. 26, 2024, 10:03 a.m.
Recovery/Reconstruction - Post-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 11:43 a.m. Sept. 26, 2024, 10:03 a.m.
P03 - Land Use and Land Cover datasets | P03.2 - LULC: CLC @1:25000 (UPDATE) Firm Product generation Essential Availability May 13, 2020, 11:48 a.m. Sept. 26, 2024, 10:03 a.m.

Data

Data Level of compliance Note Information costs Handling costs Created on Last updated on
HYDROLARE Partially Coverage may not be complete. The dataset accuracy could be lower than target. May 26, 2023, 11:38 a.m. Sept. 26, 2024, 10:03 a.m.
Wikimapia Partially Dataset completeness is location dependent. Available in Rapid Mapping SDI. Oct. 1, 2018, 12:01 p.m. Sept. 26, 2024, 10:03 a.m.
Natural Earth Dataset Partially Accuracy is lower than threshold. Oct. 24, 2018, 10:19 a.m. Sept. 26, 2024, 10:03 a.m.
Near real-time Global Flood Monitoring (GFM) Partially Coverage may not be complete. The dataset accuracy could be lower than target. May 26, 2023, 11:37 a.m. Sept. 26, 2024, 10:03 a.m.
River and Catchment Database (CCM) Partially Accuracy is lower than threshold. Oct. 18, 2018, 4:44 p.m. Sept. 26, 2024, 10:03 a.m.
Shuttle Radar Topography Mission Water Body Dataset (SWBD) Partially Available in Rapid Mapping SDI. Accuracy is lower than threshold. Coverage is not complete: SRTM has collected data over most of the land surfaces that lay between 60 degrees north latitude and 54 degrees south latitude. That's about 80% of all the land on the Earth. Nov. 17, 2017, 10:30 a.m. Sept. 26, 2024, 10:03 a.m.
OpenStreetMap Partially Reason for partial requirement fulfillement is dataset location dependency. Available in Rapid Mapping SDI. Oct. 12, 2018, 12:47 p.m. Sept. 26, 2024, 10:03 a.m.
Vector Map1 (VMap1) Partially Accuracy is lower than threshold. Available in Rapid Mapping SDI. Not all tiles have been publicly released. Oct. 1, 2018, 10:38 a.m. Sept. 26, 2024, 10:03 a.m.
HydroATLAS Fully April 29, 2024, 3:42 p.m. Sept. 26, 2024, 10:03 a.m.
World Countries Open Data: Hydrography Partially The level of compliance of the Dataset must be verify case by case Jan. 5, 2021, 12:35 p.m. Sept. 26, 2024, 10:03 a.m.
INSPIRE Annex I: Hydrography Partially The level of compliance of the Dataset must be verify case by case. Coverage could be not complete. Some datasets are free for emergency purpose (CEMS). If datasets are available offline, a request form must be filled and sent for authorization before being granted data access. Nov. 11, 2020, 5:49 p.m. Sept. 26, 2024, 10:03 a.m.
Global Water Measurements Partially Coverage could be not complete. Sept. 26, 2024, 10:02 a.m. Sept. 26, 2024, 10:03 a.m.