Back to requirement list

Requirement details

Name Soil map
Note i) Datasets describing soil inventories, providing one-off assessments of soil conditions and/or soil properties at certain locations and at a specific point in time, and allow soil monitoring, providing a series of assessments showing how soil conditions and/or properties change over time. ii) Datasets describing soil mapping, providing a spatial presentation of the properties linked to the soils, including soil types; typically, soil maps are derived with the help of data available in soil inventories. Also other soil related information derived from soil properties, possibly in combination with non-soil data are within the scope.
Dissemination View and Download Service
Quality Control Procedure N/A
Group Land cover / Land use
Status -
Uncertainty
N/A
N/A
N/A
Update Frequency
3 years
1 year
6 months
Timeliness
1 day
6 hours
1 hour
Scale
>1:50000
1:25000
>1:10000
Horizontal resolution
25 m
12.5 m
5 m
Vertical resolution
N/A
N/A
N/A
Essential variables
State Ready
Created on May 14, 2020, 7:37 p.m.
Last updated on April 29, 2024, 4:03 p.m.

Products

Product Level of definition Relevant for Criticality Barriers Note Created on Last updated on
Recovery/Reconstruction - Post-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 12:55 p.m. April 29, 2024, 4:02 p.m.
Prevention - Reference Maps Firm Product generation Essential Availability Jan. 20, 2021, 12:55 p.m. April 29, 2024, 4:02 p.m.
P16 - Post-disaster soil erosion risk assessment Firm Product generation Essential Availability May 14, 2020, 7:38 p.m. April 29, 2024, 4:02 p.m.
Preparedness - Pre-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 12:55 p.m. April 29, 2024, 4:03 p.m.
P17 - Post-disaster landslide risk assessment Firm Product generation Essential Availability May 14, 2020, 7:38 p.m. April 29, 2024, 4:03 p.m.

Data

Data Level of compliance Note Information costs Handling costs Created on Last updated on
Global Hydrologic Soil Groups (HYSOGs250m) Partially accuracy is lower than target Oct. 30, 2023, 9:39 a.m. April 29, 2024, 4:03 p.m.
European Landslide Susceptibility Map (ELSUS) Partially Coverage could be not complete. Dataset need further processing to obtain the final product. The dataset accuracy could be lower than target. Oct. 30, 2023, 9:42 a.m. April 29, 2024, 4:03 p.m.
Slope Length and Steepness factor for the EU (LS-factor) Partially accuracy is lower than target Jan. 15, 2021, 3:40 p.m. April 29, 2024, 4:03 p.m.
Support Practices factor for the EU (P-factor) Partially accuracy is lower than target Jan. 18, 2021, 11:16 p.m. April 29, 2024, 4:03 p.m.
Cover Management factor for the EU (C-factor) Partially accuracy is lower than target Jan. 18, 2021, 11:07 p.m. April 29, 2024, 4:03 p.m.
Fraction of Green Vegetation Cover (FCover) Partially accuracy is lower than target Jan. 18, 2021, 11:25 p.m. April 29, 2024, 4:03 p.m.
INSPIRE Annex III: Soil Partially The level of compliance of the Dataset must be verify case by case. Coverage could be not complete. Some datasets need further processing to obtain the final product. The dataset accuracy could be lower than target. Number of thematic classes could be lower than specified in the requirement section. May 26, 2023, 11:15 a.m. April 29, 2024, 4:03 p.m.
Harmonized World Soil Database Partially Dataset need further processing to obtain the final product. The dataset accuracy could be lower than target. Oct. 30, 2023, 9:48 a.m. April 29, 2024, 4:03 p.m.
Soil Atlas of Africa Fully April 29, 2024, 3:53 p.m. April 29, 2024, 4:03 p.m.
World Countries Open Data: Habitats and biotopes Partially The level of compliance of the Dataset must be verify case by case. Coverage could be not complete. Some datasets need further processing to obtain the final product. The dataset accuracy could be lower than target. Number of thematic classes could be lower than specified in the requirement section April 29, 2024, 4:02 p.m. April 29, 2024, 4:03 p.m.