Back to requirement list

Requirement details

UID 431
Name Industry and Utilities
Note The requirement represents structures associated to manufacture or production activities. The categories expected can be subdivides into different groups: 1) Harbours, waterways, dams and other waterworks; 2) Complex Constructions on Industrial Sites (e.g. construction for mining or extraction, power plant construction, chemical plant construction); 3) Other Civil Engineering Works (e.g. sport and recreation construction); 4) Pipelines, Communication and Electricity Lines (e.g. long distance pipeline, communication and electricity lines, local gas supply line, local water supply pipelines, local waste supply pipelines). Coverage requirement: Global. Data type: vector. Geometry type: point/line/polygon.
Dissemination View and Download Service
Quality Control Procedure N/A
Group Industry and Utilities
Status -
Uncertainty
N/A
N/A
N/A
Update Frequency
3 years
1 year
6 months
Timeliness
3 hour
1 hour
< 1 hour
Scale
>1:10000
1:5000
>1:1000
Horizontal resolution
5 m
2.5 m
0.5 m
Vertical resolution
N/A
N/A
N/A
Essential variables
State Ready
Created on May 12, 2020, 11:02 a.m.
Last updated on May 31, 2023, 11:41 a.m.

Products

Product UID Product Level of definition Relevant for Criticality Barriers Note Created on Last updated on
526 Preparedness - Pre-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 11:52 a.m. May 31, 2023, 11:41 a.m.
525 Prevention - Reference Maps Firm Product generation Essential Availability Jan. 20, 2021, 11:51 a.m. May 31, 2023, 11:41 a.m.
527 Recovery/Reconstruction - Post-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 11:52 a.m. May 31, 2023, 11:41 a.m.
442 P15 - Detailed impact assessment/exposure analyses on selected aspect Firm Product generation Essential Availability May 13, 2020, 1:26 p.m. May 31, 2023, 11:41 a.m.
423 P02 - Reference dataset | P02.2b - Reference dataset @1:10000 high level update Firm Product generation Essential Availability May 13, 2020, 1:22 p.m. May 31, 2023, 11:41 a.m.
436 P09 - Reconstruction monitoring Firm Product generation Essential Availability May 13, 2020, 1:25 p.m. May 31, 2023, 11:41 a.m.
454 P08 - Detailed damage assessment analysis over affected areas | P08.1 - Detailed damage assessment analyses over affected areas @ 1:5000 Firm Product generation Essential Availability May 13, 2020, 1:25 p.m. May 31, 2023, 11:41 a.m.
422 P02 - Reference dataset | P02.2a - Reference dataset @1:10000 low level update Firm Product generation Essential Availability May 13, 2020, 1:22 p.m. May 31, 2023, 11:41 a.m.
420 P02 - Reference dataset | P02.1a - Reference dataset @1:5000 low level update Firm Product generation Essential Availability May 13, 2020, 1:21 p.m. May 31, 2023, 11:41 a.m.
421 P02 - Reference dataset | P02.1b - Reference dataset @1:5000 high level update Firm Product generation Essential Availability May 13, 2020, 1:21 p.m. May 31, 2023, 11:41 a.m.
455 P08 - Detailed damage assessment analysis over affected areas | P08.2 - Detailed damage assessment analyses over affected areas @ 1:10.000 Firm Product generation Essential Availability May 13, 2020, 1:25 p.m. May 31, 2023, 11:41 a.m.
447 P20 - Detailed reference dataset for high importance areas Firm Product generation Essential Availability May 13, 2020, 1:26 p.m. May 31, 2023, 11:41 a.m.
441 P14 - Impact assessment/exposure analysis on assets and population Firm Product generation Essential Availability May 13, 2020, 1:25 p.m. May 31, 2023, 11:41 a.m.

Data

Data UID Data Level of compliance Note Information costs Handling costs Created on Last updated on