Back to requirement list

Requirement details

UID 115
Name Industry and Utilities
Note The requirement represents structures associated to manufacture or production activities. The categories expected can be subdivides into different groups: 1) Harbours, waterways, dams and other waterworks; 2) Complex Constructions on Industrial Sites (e.g. construction for mining or extraction, power plant construction, chemical plant construction); 3) Other Civil Engineering Works (e.g. sport and recreation construction); 4) Pipelines, Communication and Electricity Lines (e.g. long distance pipeline, communication and electricity lines, local gas supply line, local water supply pipelines, local waste supply pipelines). Coverage requirement: Global. Data type: vector. Geometry type: point/line/polygon.
Dissemination View and Download Service
Quality Control Procedure N/A
Group Industry and Utilities
Status -
Uncertainty
N/A
N/A
N/A
Update Frequency
3 years
1 year
6 months
Timeliness
3 hours
1 hour
< 1 hour
Scale
>1:50000
1:25000
>1:10000
Horizontal resolution
25 m
12.5 m
5 m
Vertical resolution
N/A
N/A
N/A
Essential variables
State Ready
Created on March 15, 2018, 11:43 a.m.
Last updated on May 26, 2023, 12:07 p.m.

Products

Product UID Product Level of definition Relevant for Criticality Barriers Note Created on Last updated on
525 Prevention - Reference Maps Firm Product generation Essential Availability Jan. 20, 2021, 11:55 a.m. May 26, 2023, 12:02 p.m.
52 Emergency Grading map Firm Product generation Essential Availability, Timeliness April 20, 2018, 12:12 p.m. May 26, 2023, 12:03 p.m.
51 Emergency Delineation Map Firm Product generation Essential Availability, Timeliness April 20, 2018, 12:12 p.m. May 26, 2023, 12:03 p.m.
50 Emergency Reference Map Firm Product generation Essential Availability, Timeliness April 20, 2018, 12:12 p.m. May 26, 2023, 12:03 p.m.
526 Preparedness - Pre-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 11:55 a.m. May 26, 2023, 12:03 p.m.
527 Recovery/Reconstruction - Post-disaster situation maps Firm Product generation Essential Availability Jan. 20, 2021, 11:56 a.m. May 26, 2023, 12:03 p.m.
341 First Estimate Product Firm Product generation Essential Availability, Timeliness June 28, 2019, 12:19 p.m. May 26, 2023, 12:04 p.m.
422 P02 - Reference dataset | P02.2a - Reference dataset @1:10000 low level update Firm Product generation Essential Availability May 14, 2020, 1:52 p.m. May 26, 2023, 12:04 p.m.
424 P02 - Reference dataset | P02.3a - Reference dataset @1:25000 low level update Firm Product generation Essential Availability May 14, 2020, 1:54 p.m. May 26, 2023, 12:05 p.m.
423 P02 - Reference dataset | P02.2b - Reference dataset @1:10000 high level update Firm Product generation Essential Availability May 14, 2020, 1:54 p.m. May 26, 2023, 12:05 p.m.
441 P14 - Impact assessment/exposure analysis on assets and population Firm Product generation Essential Availability May 14, 2020, 1:59 p.m. May 26, 2023, 12:05 p.m.
434 P06 - Temporal analyses of occurred flood events Firm Product generation Essential Availability May 14, 2020, 1:56 p.m. May 26, 2023, 12:05 p.m.
425 P02 - Reference dataset | P02.3b - Reference dataset @1:25000 high level update Firm Product generation Essential Availability May 14, 2020, 1:55 p.m. May 26, 2023, 12:06 p.m.
433 P05 - Modelled flood extent for major events Firm Product generation Essential Availability May 14, 2020, 1:55 p.m. May 26, 2023, 12:04 p.m.
455 P08 - Detailed damage assessment analysis over affected areas | P08.2 - Detailed damage assessment analyses over affected areas @ 1:10.000 Firm Product generation Essential Availability May 14, 2020, 1:56 p.m. May 26, 2023, 12:04 p.m.
443 P16 - Post-disaster soil erosion risk assessment Firm Product generation Essential Availability May 14, 2020, 2 p.m. May 26, 2023, 12:04 p.m.
436 P09 - Reconstruction monitoring Firm Product generation Essential Availability May 14, 2020, 1:59 p.m. May 26, 2023, 12:06 p.m.
442 P15 - Detailed impact assessment/exposure analyses on selected aspect Firm Product generation Essential Availability May 14, 2020, 1:59 p.m. May 26, 2023, 12:06 p.m.

Data

Data UID Data Level of compliance Note Information costs Handling costs Created on Last updated on
32 Wikimapia Partially Dataset completeness is location dependent. Available in Rapid Mapping SDI. Oct. 1, 2018, 12:17 p.m. May 26, 2023, 12:06 p.m.
295 Vector Map1 (VMap1) Partially Accuracy is lower than threshold. Available in Rapid Mapping SDI. Not all tiles have been publicly released. Oct. 1, 2018, 11:33 a.m. May 26, 2023, 12:06 p.m.
45 OpenStreetMap Partially Reason for partial requirement fulfillment is dataset location dependency. Available in Rapid Mapping SDI. Oct. 12, 2018, 12:56 p.m. May 26, 2023, 12:07 p.m.
607 INSPIRE Annex III: Production and industrial facilities Partially The level of compliance of the Dataset must be verify case by case. Number of thematic classes could be lower than specified in the requirement section. Nov. 11, 2020, 5:51 p.m. May 26, 2023, 12:07 p.m.